Current Project: Harley Hammond Reserve – Netball/Tennis Courts
Client: Mitchell Shire Council
Overview: Re-Construction to remove existing pavements, fencing and subgrade material and dispose of the site. Cut/Fill, and compact to form a new subbase. Supply & install a new compacted 200mm Type A fill capping layer. Supply and install a new stormwater drainage system and Sports court LED lighting.
New courts received a new 3.6m high perimeter fence including multiple gate openings. The fencing included concrete edge beams for extra support & allowing separation from the court slab.
Supply, Install & compacted 200mm class 2 crush rock layer for the final sub base. Supply and install over 300m3, 150mm double SL92 layer courts come to life. Lastly, a 4-coat acrylic system installed by Kings of Courts provided the most elite surface.